Get the latest price? We will reply as soon as possible (within 12 hours)

The operation process of the roller coating machine

2023-10-13

The operation process of the roller coating machine

  Roller coating machine is used for painting equipment, how is the equipment used in ordinary days?


  First check. Check whether there are tools on the conveyor belt of the roller coating machine, whether there are foreign objects such as rags between the steel rod and the rubber roller and arrange them, but also check whether the gas pipe of the oil pump is connected, whether the power indicator is on, and whether the uv paint is heated to 35°-50°.


Roller coating machine

  Then measure. Use vernier calipers to measure the thickness of the plate workpiece, which is convenient for adjusting the height. Then swing the lifting handle by hand to adjust the height of the roller. When adjusting the double stick roller coating machine, be sure to adjust the height of the two groups of rollers before and after.


  Then check. Put the plate workpiece under the roller, and then adjust the height of the roller until the plate workpiece just touches the roller, and then remove the plate workpiece, and then rotate the lifting handwheel to reduce 2-3 turns. Rotate and adjust the gap handle of the steel wheel until there is no gap between the steel wheel and the rubber roll, and then rotate the handle 2-3 turns to tighten the steel wheel and the rubber roll.


  Next up is refueling. Turn on the oil pump switch and add paint between the steel rod and the roller until the paint flows to the ends of the two rollers.


  Then the beginning starts. Open the roller switch and then open the steel rod switch, in order to obtain a relatively flat fine grain layer, the rotating speed of the steel rod must be slower than the roller, open the transport tube, the transport speed and the roller line speed to the same, one side of the paint pile up the phenomenon.


  The end result is production. Clean up immediately after delivery.